About the IDS-NF

An interim design report (IDR) builds on the success of the International Framework Study on a Future Neutrino Factory and Super Beam Facility (ISS), which was undertaken between June 2005 and August 2006. Since 2010 / 11, the IDR has been challenged at every turn. Exceptional technical and financial uncertainties have been documented and appropriate plans have been put forward to reduce uncertainty. This report is a reference design report (RDR) that is needed until 2012-13.